Project updatePort Coquitlam

Luxora in Port Coquitlam: Prices, Sizes and Is It Finished Yet?

Luxora’s 30 homes run $459,000 to $769,000, but the developer’s site does not yet say if the building, once due in April 2026, is finished.

By Newbuild · · How we write this

The projectLuxoraPrices, plans & completion →

Luxora's 30 homes in Port Coquitlam's City Centre run from $459,000 for a studio to $769,000 for a three-bedroom. Completion was originally targeted for April 2026, that date has now passed, and the developer's own site currently doesn't say whether the building is finished or still under construction.

The numbers, as they stand today

Luxora sits at Shaughnessy Street and Welcher Avenue, a few blocks from downtown Port Coquitlam. It's a four-storey building with 30 homes, built by Pacific New Homes. Unit sizes run 533 to 937 square feet, and floor plans span studios up to three bedrooms. The listed range is $459,000 to $769,000.

That's a narrow building by Metro Vancouver presale standards, and a narrow price band to go with it: every home here lands under $770,000, whichever floor plan a buyer picks.

Where Luxora sits against everything else selling in Port Coquitlam

Port Coquitlam has several projects selling right now, and Luxora's entry price is one of the lower ones on the list.

ProjectSuburbPrice rangeBedsHomesCompletion
The POCOCity Centre$389,900 – $999,9001–3382028
HawthorneLincoln Park$439,900 – $829,900studio–3352025
LuxoraCity Centre$459,000 – $769,000studio–3302026
PorthavenCity Centre$475,000 – $950,000studio–31082027
MarlowCity Centre$539,900 – $844,9001–2502025
RindallCity Centre$929,900 – $1,099,9003–4442025

Only The POCO opens lower, and its cheapest homes are still years from completion. Among projects with a 2025 or 2026 completion date, Luxora's starting price is the lowest on this list. Lexford, a much larger project in nearby Shaughnessy, is coming soon with homes starting at $499,900, but it hasn't released a full price range yet and isn't factored into the comparison above.

The completion question

The rationale for looking at Luxora now is timing: our records show an April 2026 completion target, and it's now September 2026. Normally that's the point where a project either has occupancy underway or a firm new date.

Luxora's own website doesn't currently answer that. There's no occupancy date, no construction-progress update, and no language stating homes are ready or still being built. Until the developer publishes that, we're not going to guess. If a reader's decision hinges on move-in timing rather than price, that's a question to put directly to the sales office rather than something we can confirm from what's published.

The incentive

Luxora is currently marketed with some kind of incentive attached, though neither the developer's site nor our records specify what it is or what it's worth. Incentives on presale and near-complete inventory are common and change without much notice, so treat this as "something is on offer" rather than a number to plan around.

What we don't have yet

A few things aren't published anywhere we can check: a deposit structure, a maintenance fee estimate, and confirmation of parking or locker inclusion. Deposit structure matters more than it sounds like it should — timing and size vary a lot between builders, and it affects how much cash a buyer needs before occupancy. Our guide to presale deposits walks through how that usually works and what buyers should ask for in writing. Anyone signing a contract on a home like this also gets a standard seven-day window to walk away after signing; see our rescission period guide for how that clock actually runs.

What changes next

This page gets revisited if one of three things happens: Pacific New Homes posts a construction or occupancy update, the price range on the remaining unsold homes moves, or a deposit structure gets published. Any of those would be new information worth a fresh look. Until then, the facts are what's above: 30 homes, $459,000 to $769,000, an incentive of unstated size, and an April 2026 target that's already passed without a public update on where things stand.

Sources

More from Port Coquitlam

All Port Coquitlam presales →